Surface wetting
Water that wets the boards from above without reaching the subfloor in depth.
Lifting and numbering hardwood, reading the subfloor and drying it to target before the floor is closed.
Fastest: call (833) 490-5225. Or send this and we call you back.
Hardwood and subfloor drying lifts boards where needed, reads the subfloor through the gaps and dries the structure to target. Boards that dry flat may be kept, and boards that stay swollen are logged for replacement. The decision on each board is written down, so the homeowner and the flooring trade work from the same record.
Hardwood that has taken water cups, swells or lifts at the joints. The boards may look fine on the day, and then move over the next weeks as the moisture leaves them. The subfloor under the boards holds water longer than the finish does.
The crew's work is to dry the subfloor first, then decide the boards. A board that is saved after the subfloor is at target is far more likely to stay flat than one that is dried on the surface alone.
A cupped or lifted board can have a sharp edge, and a floor with standing water near a live outlet is a shock risk. Wear gloves when lifting boards and keep children and pets away from the work.
Water that wets the boards from above without reaching the subfloor in depth.
Water that has reached the subfloor and holds there, even when the boards look dry.
Water that stood long enough to lift and swell the boards and wet the joist ends.
Call any hour and explain what is going on. You get a clear price before any work starts.
A floor can be saved only if the subfloor is dried to target first, because the boards will move with the moisture below.
A hardwood board sits on a subfloor, and the moisture in the subfloor moves into the board from beneath. A board that is dried on its face while the subfloor is still wet will cup or lift when the moisture reaches it. The crew therefore reads the subfloor first and sets the target from those readings.
The subfloor is read at each joist bay, because water can collect in one bay while the next dries quickly. Those readings decide when the floor can be closed.
Boards are lifted in order and numbered, so the ones that can be saved can be put back in their place.
Lifting a hardwood floor is done with care. The crew lifts boards in a pattern that gives access to the subfloor and keeps the tongue and groove intact where it can. Each board is numbered on its underside so it can be returned to its place if it is saved.
Boards that are too damaged to save are logged and removed. The log names each board, its condition and the reason for removal.
A board is kept when it dries flat and its subfloor is at target, and the decision is written.
The decision to keep or replace is made with the flooring trade, not by the crew alone. A board that dries flat after the subfloor reaches target is a candidate for keeping. A board that stays swollen or cupped after drying is a candidate for replacement.
The reason for each decision goes into the scope. The insurer and the flooring trade can then follow the same reasoning.
The subfloor and the joist ends are dried with air movement and heat, and the readings show the target is reached.
The subfloor dries from above and below if the crawl space or basement allows it. The crew sets air movement across the open floor and manages the temperature. The joist ends are read where they meet the sill, because water can sit in the joist pocket and hold there.
The subfloor is confirmed at target before the floor is closed, and the confirmation is written into the scope.
The floor is closed by a trade once the readings are at target, and the trade gets the list of boards kept and replaced.
Once the subfloor is at target, the flooring trade lays the replacement boards or refinishes the kept boards. The trade receives the list of boards kept, the boards replaced and the readings that confirm the subfloor.
A floor closed over a damp subfloor will cup, so the crew does not sign off until the readings support the closing.
The floor is closed only when the subfloor is at target and the flooring trade has the list.
Closing a floor too early is a common mistake. A subfloor that reads dry on one visit may rise again if a hidden wet area is still holding water, so the crew asks for two readings at target before the floor is closed. The flooring trade is given the list of boards and the readings.
The closing date is written into the file, and the homeowner receives a copy of the trade's completion note.
Confirm the power is off to the floor and that the water is stopped, and extract standing water.
Lift boards in a pattern that reaches the subfloor and number each board so it can be replaced in its place.
Read the subfloor at each joist bay and record the readings before any drying is set.
Dry the subfloor to target, then decide with the flooring trade which boards are saved.
Lower levels take water from storms and sewer backups, and a hardwood floor on a lower level is often the first finish to show it.
A floor that was wet once may move again if the subfloor is not fully dry, so the readings are kept with the file.
Not sure if you're covered? Check your ZIP code.
Reading and drying wet wall cavities with moisture meters, opening only where the readings require it.
Extracting water from a storefront or office, logging and moving stock, and drying the premises to readings.
Reading and drying the floor, slab and lower walls after a loss, so moisture does not stay in the room.
Opening a wet wall in a controlled way, drying the cavity and handing the closing and repairs to trades with a signed list.
No dollar figure is published on this site.
Some will, if the subfloor is at target and the boards dry flat. Those that stay swollen are logged for replacement.
Often yes, for boards that are kept and dry flat. The flooring trade decides after the readings.
It depends on the material, the depth and the air. The readings set the target, and the time follows from them.